top of page
Search

How Contractors Prepare a Home for a Roofing Project

  • Writer: VMC CONSTRUCTION GROUP
    VMC CONSTRUCTION GROUP
  • 6 minutes ago
  • 2 min read


VMC CONSTRUCTION GROUP follows a detailed preparation process to ensure the project runs smoothly, protects the property, and keeps everyone safe. Here’s what typically happens before work begins:

1. Initial Roof Inspection & Planning

  • Contractors evaluate the roof’s condition, measurements, and structural needs.

  • They discuss material options, timelines, and expectations with the homeowner.

  • A detailed project plan is created, including crew size and equipment requirements.

2. Permits and Documentation

  • VMC CONSTRUCTION GROUP obtains any required city or county permits.

  • They verify insurance coverage, warranties, and compliance with local building codes.

3. Material Ordering & Delivery Coordination

  • Shingles, underlayment, nails, flashing, and ventilation materials are ordered.

  • Delivery is scheduled in advance, often placing materials neatly on the driveway or directly on the roof (if permitted).

  • Dumpsters or trailers are arranged for debris removal.

    ree

4. Preparing the Exterior of the Home

  • Landscaping Protection: Crews cover plants, shrubs, and gardens with tarps.

  • Property Protection: Tarps or plywood are used to protect siding, windows, and exterior walls from falling debris.

  • Clearing the Work Area: Furniture, grills, and outdoor items are moved away from the home.

  • Driveway Access: Homeowners may be asked to clear vehicles so trucks and trailers can get close.

5. Preparing the Interior of the Home

  • VMC CONSTRUCTION GROUP advise homeowners to secure or remove fragile items (picture frames, mirrors, decor).

  • Homeowners are notified that vibrations may occur during installation.

  • Pets may need to be placed in quieter areas of the home.

6. Setting Up Safety Measures

  • Crews set up safety harness systems, roof anchors, and ladder stabilizers.

  • Warning signs or cones may be placed around the property.

  • OSHA safety guidelines are followed throughout the setup.

7. Removing Old Roofing Materials

  • Before installation, contractors prepare designated areas for tear-off debris.

  • Catch-all systems, tarps, or debris nets are placed to keep the yard clean and safe.

8. Weather Check & Day-of Final Review

  • VMC CONSTRUCTION GROUP checks weather forecasts to ensure a safe work window.

  • A last walkthrough of the property ensures everything is protected and ready.

  • The crew leader confirms timelines and addresses any homeowner questions.

9. Communication with the Homeowner

  • VMC CONSTRUCTION GROUP let homeowners know what to expect during the project:

    • Noise levels

    • Crew arrival times

    • Project timeline

    • Cleanup procedures

  • Homeowners receive contact information for the project manager.

ree

 
 
 
bottom of page